Sewage services

This service aims to enable real estate developers to obtain approval for the design plans of the sewage network from the National Water Company, in preparation for implementing the infrastructure and connecting the project to the public sewage network.

Most Frequently Questions

The center reviews the application, verifies that all requirements are complete, sends it to the relevant authority, and conducts regular follow-ups on the application status, escalating when necessary.
Accurate identification of the geographical location (plot number, neighborhood, city, etc.). Compliance with the Saudi Plumbing Code standards. Plans must be prepared by an accredited engineering office. A plan showing the proposed connection point from the Water Company. A folder containing the design plans for the water and fire networks. Approval of the declaration.
The developer applies for the service through the Etmam platform, filling in all required information and attaching the necessary documents. The Etmam Center reviews the application and ensures that all required documents and information are complete. The National Water Company reviews the design plans and issues the necessary approvals or comments. The developer is notified of the review results and receives either the approval or the technical comments.
The National Water Company
Real Estate Developers
Etmam Platform
58 Working Days
Through this set of services, the real estate developer will be able to obtain the necessary approvals and letters to complete the sewage network infrastructure through the National Water Company.
The status of the application can be tracked through the Etmam platform.
In the event of a rejection, the beneficiary should review the reasons for the rejection, correct them, and resubmit the license application.
You can contact us through (Contact Us).